62. Which of the following is the correct sequence of project life cycle phases?

Answer: B

Explanation:

The correct sequence of project life cycle phases is Concept, Study, Planning, Execution, Termination.

This sequence accurately reflects the standard phases involved in the project life cycle, beginning from the initial concept through to termination.

A) Study, Concept, Planning, Execution, Termination

This option is incorrect as it misplaces the order of the initial phases. The concept phase should precede the study phase, as the project begins with an idea that is then analyzed in the study phase.

B) Concept, Study, Planning, Execution, Termination

This option is correct, as it presents the phases in a logical order. It starts with the concept where the idea is generated, followed by the study phase for feasibility analysis, then planning, execution, and finally, termination.

C) Planning, Concept, Study, Execution, Termination

This option is incorrect because it starts with planning before establishing the concept. Planning should only occur after the concept and study phases have been completed to ensure a solid foundation for the project.

D) Concept, Planning, Study, Execution, Termination

This option is incorrect as it places the planning phase before the study phase. The study phase is essential for assessing the viability of the concept before moving into the planning phase.

Conclusion

The correct answer, option B, provides the accurate progression of the project life cycle phases, ensuring that each phase builds upon the previous one. All other options fail to maintain the logical sequence necessary for effective project management, which is critical for successful project execution and completion.