9. Anyone who intends to erect a new structure or to alter or repair an existing building must obtain a
Answer: B
Anyone who intends to erect a new structure or to alter or repair an existing building must obtain a building permit.
A building permit is required for anyone planning to construct a new building or make significant modifications to an existing one, ensuring that the work complies with local regulations and safety standards.
A) survey
A survey is typically used to determine property boundaries and characteristics of the land, but it does not authorize construction or alterations. Therefore, it is not sufficient for someone intending to erect or alter a structure.
B) building permit
A building permit is essential for the construction or alteration of a building. It provides legal permission to proceed with the proposed work, ensuring that it meets zoning laws, building codes, and safety regulations.
C) property report
A property report contains information about a property’s history and valuation but does not serve as a permit for construction. It is not a requirement for erecting or altering buildings.
D) subdivision plat map
A subdivision plat map is a detailed plan of how land is divided into smaller lots, which is useful in planning but does not grant permission to build or alter structures. Thus, it does not fulfill the requirement for obtaining a building permit.
Conclusion
The necessity of a building permit is clear as it is designed to regulate construction activities and ensure compliance with safety and zoning laws. All other options fail to provide the legal authorization needed for such activities, confirming that a building permit is the appropriate and required documentation for anyone looking to erect or modify a structure.